Steam Comb Shaped Labyrinth Gland Seal Ring For 185MW/300MW/600MW/1000MW Steam Turbine


Preço por unidade:

USD $ 286.00 - 1,180.00

Quantidade Mínima de Compra:

>=1 Unidade

Tipo de pagamento:

L/C (Carta de Crédito)

T/T (Transferência Bancária)

Outros

Porto de Preferência:

shenzhen or shekou

Descrição

Descrição do produto Overview Quick Details
Condition:
New
Warranty:
6 months
Applicable Industries:
Energy & Mining, power
Showroom Location:
None
Video outgoing-inspection:
Provided
Machinery Test Report:
Provided
Marketing Type:
Ordinary Product
Warranty of core components:
6 months
Core Components:
seal ring
Place of Origin:
Sichuan, China
Brand Name:
YOYIK
Model Number:
user provide
Type:
Plant
Electricity Generator Type:
thermal power
Output Voltage (V):
220
Key Selling Points:
High-accuracy
Rated power:
10kw-1000kw
Power:
Exhaust Conditions
Efficiency:
High Effiency
Certificate:
ISO9001
Manufacturer:
YOYIK (DEYANG)
Operation:
Reliable
Usage:
Thermal
Application:
Power Generation
Supply Ability
Supply Ability:
1000 Piece/Pieces per Year Steam Comb Shaped Labyrinth Gland Seal Ring For 185MW/300MW/600M
Packaging & Delivery Product Description >>

Steam Turbine Structure & Spare Parts

Steam turbine body is composed of rotating part and static part. The rotor includes main shaft, impeller, moving blade and
coupling. The stator includes steam inlet, cylinder, diaphragm, stator cascade, steam seal and bearing.

Steam Turbine Gland Sealing Rings According to the different installation positions, the steam seal is divided into flow passage steam seal, diaphragm steam seal and shaft end steam seal. The performance of steam seal has an important influence on the economy and reliability of the unit. In order to reduce the steam leakage loss and improve the safety and economy of the unit, it is necessary to use advanced steam seal technology to transform the original traditional steam seal.

Steam turbine, also known as steam turbine engine, is a kind of rotating steam power device. High temperature and high pressure steam passes through fixed nozzle and becomes accelerated air flow, and then it is sprayed onto the blade to make the rotor with blade row rotate and work externally at the same time. Steam turbine is the main equipment of modern thermal power plant. It is also used in metallurgical industry, chemical industry and marine power plant.

Operating of 
Steam Turbine Steam turbine is an external combustion rotary machine that can convert steam heat energy into mechanical work. After the steam from the boiler enters the steam turbine, it passes through a series of annular nozzles and moving blades in turn, converting the heat energy of the steam into mechanical energy for the rotation of the steam turbine rotor.

Steam Turbine Supporting Facilities

Steam turbine usually works under the condition of high temperature, high pressure and high speed. It is a kind of relatively precise heavy machinery. Generally, it must form a complete set of equipment with boilers, generators, condensers, heaters, pumps, etc. to work in coordination.
Related Products >> Our Company >> Dongfang Yoyik Engineering Co., Ltd was founded in 2004 and specialized in manufacturing spare parts for steam turbines, turbine generators, boilers, etc. We provide products for power plants distributed to worldwide.

Factory

Our Factory

Workshop

Our Workshop

Warehouse

Our Warehouse

Production

Production Line



Our coorperation with well-known enterprises in the industry.

We have built long-term business relationship on the basis of providing reliable and successful solutions. Packing >> STANDARD & SOLID PACKAGING ENSURES YOUIR GOODS SAFETY.
VARIOUS PROFESSIONAL PACKAGES AT YOUR CHOICE.
Shipping >>
Shipping Methods Range Time Cost Tracing
By Air World wide 1-2 wks Average Not traceable
By Sea 1-3 Months Cheap Tracking ID available
International Express 4-7 Days Expensive
FAQ >> Q: Are you trading company or manufacturer?
A: We are factory located in Deyang, China.

Q: How long is your delivery time?
A: Generally it is 2-5 days if the goods are in stock. Or it is 7-21 days if the goods are not in stock, it is according to
quantity.

Q: Do you provide samples? Is it free or extra?
A: Sorry we do not offer samples.

Q: What is your term of payment?
A: Our payment term is T/T 100% advance payment.


If you have another question, please feel free to contact us as below:

Meo Machinery Co.LTD

Total de Empregados
  • 501-1000 pessoas

Ano Estabelecido
  • 2000

Contato e localização
  • Hangzhou,Zhejiang Province,China(Mainland)